|
州政府三周前宣告了Parramatta Light Rail的stage 1 在2018年开工,2023年守旧,列出了上面的几个站。大家来颁发一下这个对沿线的房子有无可能rezone?
The stage 1 route was announced on 17 February 2017. The stage 1 route runs between Westmead and Carlingford via North Parrramatta, the Parramatta CBD, Camellia, Rydalmere, Dundas and Telopea. A list of sixteen provisional stops was released for the twelve kilometre route. The stops are:[27]
Interactive map of stage 1
Westmead
Westmead Hospital
Children’s Hospital
Cumberland Hospital
Factory Street
Fennell Street
Prince Alfred Square
Eat Street
Parramatta Square
Harris Street
Tramway Avenue
Camellia
Rydalmere
Dundas
Telopea
Carlingford
Land has been purchased for a maintenance and stabling facility, to be located east of Rosehill Racecourse. Trams will access the facility via a short branch line that uses the alignment of the disused Sandown heavy rail line.[28][29]
Construction for Stage 1 is expected to begin in 2018 and be completed by 2023. Services are expected to operate every 7.5 minutes throughout the day.[30] |
|