|
你没有当真浏览资料的subdivision部份
32.09-3 Number of dwellings on a lot
VC104
The number of dwellings on a lot must not exceed the number specified in a schedule to this zone. If no number is specified, the number of dwellings on a lot must not exceed two.
Transitional provisions
Clause 32.09-3 does not apply to an application to construct two or more dwellings on a lot made before the approval date of the planning scheme amendment that introduced this clause 32.09 into the planning scheme. |
|