去年十月底第一次有了分地的设法,因而找council收费的urban planner聊了十几分钟,理解了一个大略,就无知者无畏的踏上了这条不归路。
11月中拜托了请求DA的consultant,运气还算不错,这家帮我梳理需求做的事件和拜托第三方,很耐烦的解答我各种小白问题,也会踊跃push其余第三方出效果。历经三个月(包罗了圣诞先后废掉的一个月),终于拿到DA package。
DA后,在真实的划分地块titling前,是operational works stage,这阶段的主导方变为了civil engineer,也是过后请求DA帮着画图的engineer。这家沟通起来就比过后consultant差远了,也会回答我问题,但不太会提供解决计划。所以当初到论坛问问履行层面的教训。
engineer目前正在按照DA做分地所需的design,我置信他们design任务的专业性,所以临时不去细谈。我面临的问题是如何实现这个design,必将要找contractor来做各种site works,那末如何找,找几个,前后程序,这些我就没有了设法。下列是我给engineer讯问的信:
I understand we are currently at the design stage of the operational works and then waiting for council approval. Should we start finding contractors to do the site works meantime?
After reading the DA package, the following tasks need to be done related to site works:
•Retaining wall and fence
•filling & excavation
•water & sewerage connection
•crossover & footpath
Are there any other works left behind? Could you please provide a sample of the work scope for tendering purpose?
Should normally all these jobs done by one contractor or different ones? Any certificate or qualification required for the contractor? It would be great if any reco妹妹endations on contractors.
当初engineer还没对上述问题进行回答,但咱们时间对比紧,想尽快开始接触contractor,好锁定他们的档期。还盼着有教训的敌人帮助分享下这个阶段的教训。多谢 |
|