费劲周折找到一个合适的plan, tender 来了,只有总价和一些提供的项目,但没有itemised 的价格,比如就列了site cost 接水接电,挖土平整土地waffle slab to M and H, 3000l water tank ,DEB BASIX Hydraulic 额外花销需要report 出啊来后定,其他列了升级比如窗户变门,升高层高,shower 升到frameless,加了窗户和 fly screen . 但所有都没有单列价格,只是那个upgrades package 印在册子上的5000刀写了,按照大家的意见索要breakdown price ,builder 回了,说不提供。又加了一段话没看懂,求大家帮忙。
Thanks for the email, no we don’t do that as I mentioned to you in our last meeting.
“With respect you wouldn’t know if the pricing for those individual items is enough or not. It is much better for you the consumer that we have our tender as is.
这是啥意思,我该怎么办,我在这个plan花了太多时间,是否该放弃,还是继续?谢谢 |
|