|
1600阿谁不换就是放在目前的板上 所以我才不肯定怎么实操… hipages上po了一下明白需求level 2来换石棉板,目前有一个给的更低 1500
Quote includes.
Removal and disposal of current -
- meterbox and asbestos switchpanel.
- supply and install new meterbox with mdf switchpanel
- supply and install rcbos to protect all internal circuits and 3phase main switch and circuit breakers as necessary
- new subboard with internal neutral link
- testing and co妹妹issioning with certification.
$1500 inc gst
这个看着不错啊 有啥罅漏吗? |
|